Standard Description
Outfitted with all the zero leak bidirectional checking sole-noid valves, this energy unit is built for that operation of two independent circuits. Which are respectively for the major and subordinate platforms of the double scissors lift. Two cut-off valves are utilized for lowering the machine manually in case of energy reduction. If more independent circuits are needed for the application please make contact with us for availability.
Remark: 1. Please consult our revenue engineer to the different pump displacement, motor energy or tank capacity.
2. CSA or UL licensed motors can be found on request.
Distinctive Notes
one. The AC motor is of S3 duty cycle, which might only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all of the hydraulic elements concerned just before set up of the electrical power unit.
three. Viscosity with the oil shoud be 15~46 cst,and also the oil need to be clean and free of charge of impurities,N46 hydraulic oil is recommended.
four. The electrical power unit ought to be mounted vertically.
five. Check the oil degree in the tank following the first working with the energy unit.
six. Oil modifying is required just after the first a hundred operation hrs,afterwards after each 3000 hrs.