Owing to our extensive merchandise range and prosperous activities in this industry, Ever-Electricity Team CO., LTD. IS Professional IN Creating ALL Types OF MECHANICAL TRANSMISSION AND HYDRAULIC TRANSMISSION LIKE: PLANETARY GEARBOXES, WORM REDUCERS, IN-LINE HELICAL Gear Velocity REDUCERS, PARALLEL SHAFT HELICAL Equipment REDUCERS, HELICAL BEVEL REDUCERS, HELICAL WORM Gear REDUCERS, AGRICULTURAL GEARBOXES, TRACTOR GEARBOXES, Automobile GEARBOXES, PTO Drive SHAFTS, Special REDUCER & Relevant Equipment Parts AND OTHER Relevant Goods, SPROCKETS, HYDRAULIC Technique, VACCUM PUMPS, FLUID COUPLING, Equipment RACKS, CHAINS, TIMING PULLEYS, UDL Velocity VARIATORS, V PULLEYS, HYDRAULIC CYLINDER, Equipment PUMPS, SCREW AIR COMPRESSORS, SHAFT COLLARS Reduced BACKLASH WORM REDUCERS AND SO ON. a specialised supplier of a complete variety of chains, sprockets, gears, equipment racks, V-belts, couplings and reducers.
three inch Forged Iron Self priming EPTT Irrigation Centrifugal EPT
Framework Picture
EPTnical Parameters
Design | Velocity RPM |
Flow Fee | EPT | EPTT | Inlet ampoutlet Dia. | Max.Pass JCEP Dia. | Max.Suction Elevate | ||
m3/h | I/s | m | KW | HP | mm | mm | m | ||
JT-3 | 750* | 25 | six.nine | two.3 | .seventy five | 1 | eighty(three) | 63.5 | 1.five |
850 | thirty | eight.3 | 3 | 1.five | two | one.8 | |||
950* | 32.5 | 9. | four | one.5 | 2 | 3. | |||
1050 | 40 | 11.1 | four.5 | 1.5 | two | 4. | |||
1150 | forty two.5 | eleven.8 | 5.5 | 3 | four | four.9 | |||
1250 | forty five | 12.5 | 7 | four | 5.five | five.five | |||
1350 | fifty | 13.nine | 8 | 4 | five.5 | five.8 | |||
1450* | fifty two.five | fourteen.six | ten | 5.5 | seven.five | six.4 | |||
1550 | 55 | 15.3 | eleven.five | 5.5 | 7.five | 6.four | |||
1650 | 60 | 16.7 | 12.five | seven.five | 10 | six.seven | |||
1750 | 65 | eighteen.one | 14.5 | eleven | fifteen | 6.seven | |||
1850 | 70 | 19.four | 16.5 | 11 | 15 | seven.6 | |||
1950 | seventy two.5 | 20.one | 18 | 15 | 20 | 7.6 | |||
2050 | 75 | 20.8 | 21 | fifteen | twenty | seven.six | |||
2150 | eighty | 22.two | 23 | 18.five | 25 | seven.six | |||
2250 | ninety | 24.5 | 26 | 18.5 | twenty five | 7.six | |||
2350 | a hundred | 27.five | 27.five | eighteen.5 | twenty five | seven.6 |
Perforance Curve
Characteristic
one.EPT and Dry mounting for fast and simple companies
JT series are self-priming centrifugal pump , they can be mounted on substantial and dry at flooring amount ,with only the suction line down in the liquid . Support or servicing can be done speedily and basically with frequent hand equipment and with no obtaining to pull the pump . There are no EPTT EPT shafts to install and align . no hoists or cranes JCEP , and no need for support personnel to EPTTr the pump.
2. Clogging is kept to a bare minimum ,so downtime is virtually eliminated
JCEPs managing pump is created for almost clog-free overall performance,will handle spherical solids up to three inch ( 76mm ) in diameter and let solids to pass via the complete pump , not just the impeller . If a clog does take place ,it can be eradicated swiftly and simply by opening the cover plate, removing the clog ,and returning the pump to normal procedure ,all in just a handful of minutes’ time .
3.Services is basic , fast and inexpensive
The removable protect plate allows for hassle-free inspection or support of the impeller ,seal and put on-plate , with no EPTT instruments JCEP . If the pump shaft or bearing want service , the entire rotating assembly can be taken off with no disturbing the pump casing or piping . plus , the rotating assembly is sealed with an O-ring which permits exterior clearance changes .
four.EPTT priming implies dependable functionality
Require extremely minor interest , ensuing in significant financial savings of upkeep time and money , Appropriately utilized and mounted , and right after an first priming , will carry on to reprime instantly . Our J sequence pumps will reprime with only a partly filled pump casing and a fully dry suction line .
Software
1. EPT engineering ,Wastewater therapy ,constructional engineering
two. Sewage EPTion or discharge in residential community
three. Sewage discharge in medical center and lodge
4. EPTized and staged disposal in sewage treatment method EPTT
five. JCEP drainage station
6. Critically polluted h2o discharge
seven. EPTT irrigation
8. JCEP fighting system.
Our Provider
Pre-sale
Excellent pre-sale service is an EPTTant guarantee to the client curiosity. Our Specialist senior provider engineer to give customers with design strategies and consultant, which avoids the pointless reduction brought on by improper operation of consumers to the greatest extent.
In-sale
Our very expert services personnel constantly supplies monitoring provider, offering instruction to installation, explicating the operation primary details and cautions in orEPTTto make certain the effective procedure of the merchandise and reduce the breakdowns triggered by poor procedure of clients to the greatest extent.
Right after-sale
We will verify the customers’ utilization of pump typical positively in orEPTTto appropriate the poor operation of clients in time, carry by way of the advice of servicing in time.
Our Team